LAND RELEASE STAGE 27-2
oranparktown.com.au
Call 9043 7500
oranparktown
WORK
FUTUR
DETENTION BASIN TRANSG
RID EAS EME
NT
SEWER VENT
TRANSG
7201
SWALLOW
*
UE
G
Basin
534.9m2
7205
7202
300.7m2
AVEN
G
BE
7203
BE
LOOP
BE
BE
300m2 300.8m2 375.8m2
7224
7223
7222 7221
295.7m2 250m2 BE
250m2
BE
250m2
BE
OR ID
SWALLO
7220
7219
312.5m2
250m
BE
250m
BE
312.5m2
7216
BE
W
LOOP
D
7229
A
AR
IA
N
350m
433.4m
D
A
7226
7230
RIP
A
7233
280m
2
7234
350m2
7235
350m2
7236
420m2
BE
420m2
A
A
7227
K
7232
350m2
BE
A
EE
355.7m2
S C R
7231
280m2
418.5m2
355.7m2
7228
7249
A
7248
350.6m2
350m2
7247 350m2
A
A
A
A
7246 7245 7244
280m
280m2
280m2
BE
BE
BE
2
N’
2
V
K
A
433.2m
RO
7215
7218 7217 2
2
72252
A
A
CO
RR
H F
K
7242
350m2
4 A
7243
350m2
V
7241
7
4
420m2
72
51
H
CORELL
A
B
7253
Stage 2
Tranche 27
7254
412.7m2
7255
450.8m2
7256
350m2
7257
350m2
7258
420m2
7259
420m2
7260
350m2
348m2
A A
A
7269
A
7268
443.9m2
7267
450.8m2
A
7266
300.2m2 350m2
A
A
A
7265 7264
7263
G
280m2 280.5m2 BE
7262
435.5m2
7261
385.4m2
404.3m2
BE
SONG B IRD
CLO A
SB
7272
7273
368.1m2
7274
449.1m2
447.6m2
GR
AS
366.4m2
A
7285
422.2m2
40
50
60
70
80
90
100
SCALE 1:2000 (A3)
ay
SCALE 1:1000 (A1)
30
7278
373.4m2 A2
7284
7283
412.2m2
ay*
20
7277
316.9m2
A
396.9m2
A
7282
378.9m2
7281
321m2
7280
320m2
7279
318m2
IN
FALCON
7276
323.2m2
M
B
7286
357.4m2
A
RO
eek
B D
C
*
A
ated on both eastern and western
A H
7287
410.1m2
A
7275
325.2m2
AD
E
7271
LAN
7270 423.5m2
A
SE
ER
IRD
*
E
LANE
AVENU
MUSK
H
721
412m2
A
Ron’s Creek
A
350m
B
H
412
A
300.7m
C
10
7212
2
7204
0
72
7206 7207 7208 7209 7210 7211
349.9m2 263.1m2 261.6m2 271.8m2 287.5m2
503.3m2
C
RID EA
ASEMEN
N
T
P
FUTURE ROAD
213
2.7m2
142
STAGE 27-2
m
5
m2
6
1
3 2 5
7237
7238
B
418.7m2
7239
DRIVE
B
519.3m2
418.8m2
4
B
240
11.2m2
1.
325m Dawson Park & Splash Park
2.
1.1km Oran Park High School
3.
1km Oran Park Primary School
4.
940m Podium Shopping Centre
5.
950m Future Oran Park Train Station
All distances are approximate
LEGEND
DRAN
SFIEL
D
(A) (A2) (B) (BE) (V) (K)
Stage 27-2 Lots to be sold through Expression of Interest – 27-2D Standard Release Sales Process – 27-2C Existing residential Medium density Drainage Easement 1.5 wide Drainage Easement variable width Right of Carriage way 5.5 wide Building envelope Positive covenant 1.8m wide Restriction on use 1.8m wide Dual occupancy allowed Sewer line Retaining wall Electrical substation and building restriction Street tree Shareway 3.0m wide Pathway 1.5m wide Common Driveway Shareway bridge 2.5m wide Creek crossing (steppers) Transmission tower Denied access (Lots 7237-7240) Shelters Seating Fitness Stations Drinking Fountains Gym Equipment
This is a statement of present intent only based on the best available knowledge at the time, which may change due to future circumstances and any such statement will not amount to a legally enforceable representation.
SALES PLAN NOTES ORAN PARK TOWN – STAGE 27-2 1.
Lots in this sales release may have been filled in part or whole during road and drainage construction and intending purchasers should satisfy themselves of all special requirements which Council may have in relation to building on these lots.
11. To ascertain whether any applications have been lodged on any adjoining or nearby properties, any person may during ordinary business hours and free of charge, inspect the register of applications for development consent held at the office of the Council.
2. Sewer locations shown are based on current design information only and the Developer accepts no responsibility for the accuracy of these
12. The Developer makes no warranty in relation to the area within and
locations. Position of sewer lines shown is in accordance with current
surrounding its estate, and its future facilities or developments in the
design plans. Final position of sewer lines as constructed may vary.
vicinity of this area. This plan is a statement of a present intention
Intending purchasers should make enquiries at Sydney Water for
only based on the best available knowledge at the time, which may
such final sewer location prior to building commencement. Council may have specific requirements for a building located in close
change due to future circumstances and any such statement will not amount to a legally enforceable representation.
proximity to sewer lines. 3. Intending purchasers should ascertain the requirements of Council and servicing authorities relating to the allotment prior to purchase. 4. Dimensions and areas are subject to the registration of the Deposited
13. The plan shown in this brochure is a concept plan based on information provided to the Developer at the date of production of this brochure. The concepts depicted in this brochure do not amount to a warranty and are subject to change without notice. The
Plan and 88b Instrument. 5. All residential lots are burdened with Restrictions on the Use of Land as set out in the section 88b instruments or other dealings. 6. The Developer accepts no responsibility for the accuracy,
Developer accepts no liability for any such change. 14. This document should be read in conjunction with the document “Masterplan” dated November 2019.
preservation and replacement of survey marks. 15. If the purchaser has not substantially commenced the home within 7. The land uses and zonings shown herein are correct to the best knowledge of the Developer as at June 2020. The Developer can accept no responsibility for future variations to any land uses or zonings. Intending purchasers should satisfy themselves as to the current status of information by contacting the relevant authorities direct.
24 months after the acquisition date the Developer may buy back the lot in line with the terms and conditions set down in the Contract. 16. All lots will be provided with one point of connection for services. If further connections are required for an individual lot, these will be the responsibility of the purchaser.
8. Unless otherwise stated herein, the Developer will not contribute to the cost of boundary fencing. 9. SERVICING: The following information has been determined as at June 2020. If further information is required, intending purchasers should contact the relevant servicing authorities direct. Water: (Sydney Water)
17. Secondary dwellings of greater than 60 square metres (including duplexes) will be expressly precluded from being built on lots in this release except where indicated on the Sales Plan. 18. Purchasers in this release are advised they are not permitted to onsell vacant lots without the prior approval of the Developer which
Electricity: (Endeavour Energy) Sewer: (Sydney Water) Communications: (Opticomm) Gas: (Jemena)
approval may not be forthcoming. For full details please refer to the Contract for Sale of Land. 19. Some lots within this release are subject to Bushfire Attack Level
10. Lot classifications will be determined in accordance with AS2870 – 1996 Residential Slabs and Footings. A geotechnical report will be
ratings and need to be built to specific standards. Please refer to our Sales Office for more details.
supplied to Camden Council. Intending purchasers should satisfy themselves as to the classification and any requirements Council may have in relation to these lots. Purchasers are notified that this site
20. Some lots are affected by by acoustic construction requirements. Refer to our Sales Office for more details..
may be affected by urban salinity.
oranparktown.com.au
Call 9043 7500
oranparktown
August 2020
^ Conditions apply. Refer to Contract for Sale of Land. Greenfields reserves the right to vary prices and withdraw any lots for sale.