Line 3 (Chengdu Metro)
Appearance
Line 3 | |
---|---|
3 | |
Platform of Line 3 in Chunxi Road station | |
Overview | |
Status | Operational |
Owner | Chengdu |
Locale | Chengdu, China |
Termini | |
Stations | 37 |
Service | |
Type | Rapid transit |
System | Chengdu Metro |
Services | 1 |
Operator(s) | Chengdu Metro Limited |
Daily ridership | 354,200 (2016 Peak)[1] |
History | |
Opened | 31 July 2016 |
Technical | |
Line length | 49.85 km (30.98 mi) |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 3 of the Chengdu Metro (Chinese: 成都地铁3号线; pinyin: Chéngdū Dìtiě Sān Hào Xiàn) runs in a northeast-southwest direction from Chengdu Medical College to Shuangliu West Station. The total length is 49.85 km (30.98 mi). Line 3's color is magenta. Phase 1 of this line began construction on 28 April 2012, and opened on 31 July 2016.[2]
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Chengdu Junqu General Hospital — Taipingyuan | 31 July 2016 | 20.33 km (12.63 mi) | 17 | Phase 1 |
Taipingyuan — Shuangliu West Station | 26 December 2018[3] | 49.85 km (30.98 mi) | 37 | Phase 2 |
Chengdu Medical College — Chengdu Junqu General Hospital | 26 December 2018[4] | 49.85 km (30.98 mi) | 37 | Phase 3 |
Stations
See also
References
- ^ "9月30日成都地铁客流达238.11万乘次 创新高". 成都全搜索新闻网. Retrieved 2016-10-02.
- ^ 3号线来了 31日8时30分正式开通. Chengdu Economic Daily. 2016-07-28. Retrieved 2016-07-28.
- ^ https://cd.scol.com.cn/m/sdxw/201812/56771318.html
- ^ https://cd.scol.com.cn/m/sdxw/201812/56771318.html