Line 3 (Chengdu Metro): Difference between revisions
Appearance
Content deleted Content added
No edit summary |
No edit summary |
||
Line 35: | Line 35: | ||
| map_state = collapsed |
| map_state = collapsed |
||
}} |
}} |
||
'''Line 3''' of the '''[[Chengdu Metro]]''' ({{zh|s=成都地铁3号线|p=Chéngdū Dìtiě Sān Hào Xiàn}}) runs in a northeast-southwest direction from Chengdu Medical College to Shuangliu West Station. The total length is {{convert| |
'''Line 3''' of the '''[[Chengdu Metro]]''' ({{zh|s=成都地铁3号线|p=Chéngdū Dìtiě Sān Hào Xiàn}}) runs in a northeast-southwest direction from Chengdu Medical College to Shuangliu West Station. The total length is {{convert|49.85|km|abbr=on}}. Line 3's color is <span style="color:#d40f7d">'''magenta'''</span>. Phase 1 of this line began construction on 28 April 2012, and opened on 31 July 2016.<ref>{{cite news |script-title=zh:3号线来了 31日8时30分正式开通|url=http://e.chengdu.cn/html/2016-07/28/content_570644.htm|publisher = Chengdu Economic Daily|date=2016-07-28|accessdate=2016-07-28}}</ref> |
||
==Opening timeline== |
==Opening timeline== |
Revision as of 14:24, 29 December 2018
Line 3 | |
---|---|
3 | |
Platform of Line 3 in Chunxi Road station | |
Overview | |
Status | Operational |
Owner | Chengdu |
Locale | Chengdu, China |
Termini | |
Stations | 37 |
Service | |
Type | Rapid transit |
System | Chengdu Metro |
Services | 1 |
Operator(s) | Chengdu Metro Limited |
Daily ridership | 354,200 (2016 Peak)[1] |
History | |
Opened | 31 July 2016 |
Technical | |
Line length | 49.85 km (30.98 mi) |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 3 of the Chengdu Metro (Chinese: 成都地铁3号线; pinyin: Chéngdū Dìtiě Sān Hào Xiàn) runs in a northeast-southwest direction from Chengdu Medical College to Shuangliu West Station. The total length is 49.85 km (30.98 mi). Line 3's color is magenta. Phase 1 of this line began construction on 28 April 2012, and opened on 31 July 2016.[2]
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Chengdu Junqu General Hospital — Taipingyuan | 31 July 2016 | 20.33 km (12.63 mi) | 17 | Phase 1 |
Taipingyuan — Shuangliu West Station | 26 December 2018[3] | 49.85 km (30.98 mi) | 37 | Phase 2 |
Chengdu Medical College — Chengdu Junqu General Hospital | 26 December 2018[4] | 49.85 km (30.98 mi) | 37 | Phase 3 |
Stations
See also
References
- ^ "9月30日成都地铁客流达238.11万乘次 创新高". 成都全搜索新闻网. Retrieved 2016-10-02.
- ^ 3号线来了 31日8时30分正式开通. Chengdu Economic Daily. 2016-07-28. Retrieved 2016-07-28.
- ^ https://cd.scol.com.cn/m/sdxw/201812/56771318.html
- ^ https://cd.scol.com.cn/m/sdxw/201812/56771318.html