www.fgks.org   »   [go: up one dir, main page]

Jump to content

Picton–Mittagong loop railway line: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
m Minor change to wording.
Changing short description from "Railway line in Australia" to "Railway line in New South Wales, Australia"
 
(35 intermediate revisions by 24 users not shown)
Line 1: Line 1:
{{Short description|Railway line in New South Wales, Australia}}
{{Use dmy dates|date=November 2012}}
{{Use dmy dates|date=August 2021}}
{{Use Australian English|date=January 2012}}
{{Use Australian English|date=January 2012}}

{{Infobox Sydney public transport
{{Infobox rail line
|logo=[[File:CityRailbusblue.png]]
| box_width = auto
|name= Picton to Bowral
| name = Picton–Mittagong Loop Line
|transport_mode=Bus
| status = Heritage operation; partially disused
|line_owner=
|operation_area=[[Southern Highlands, New South Wales|Southern Highlands]]
| locale = Southern Highlands
| stations = 9
|map_colour=Green
| owner =
|line_length=
| operator = [[Transport Heritage NSW]]
|stations_number=9
| open = February 1867
|interchange_names=Picton<br/>Thirlmere<br/>Bowral
| map = {{maplink|type=line}}
|operator_names=[[NSW TrainLink]]
}}
|date_1=1867
{{routemap
|event_1=Line opened
|title =Picton Loop Line
|date_2=1919
|map =
|event_2=Bypassed by Bargo deviation
ABZq+r~~Picton Junction
|date_3=1987
exTUNNEL1~~Old Main Tunnel
|event_3=Through line severed
STR
STR
BHF~~[[Thirlmere railway station, New South Wales|Thirlmere]]
eHST~~[[Couridjah railway station, New South Wales|Couridjah]]
HST~~[[Buxton railway station, New South Wales|Buxton]]
exHST~~[[Balmoral railway station, New South Wales|Balmoral]]
exHST~~[[Hill Top railway station, New South Wales|Hill Top]]
exHST~~[[Colo Vale railway station, New South Wales|Colo Vale]]
exHST~~[[Braemar railway station, New South Wales|Braemar]]
eABZql~~Mittagong Junction
}}
}}
{| {{Railway line header}}
{{BS-header|Picton Loop Line}}
{{BS-table}}
{{BS|ABZ3lg||Picton Junction|}}
{{BS|exTUNNEL1||Old Main Tunnel}}
{{BS|STR}}
{{BS|STR|}}
{{BS|BHF||[[Thirlmere railway station, New South Wales|Thirlmere]]}}
{{BS|eHST||[[Couridjah railway station, New South Wales|Couridjah]]}}
{{BS|HST||[[Buxton railway station, New South Wales|Buxton]]}}
{{BS|exHST||[[Balmoral railway station, New South Wales|Balmoral]]}}
{{BS|exHST||[[Hill Top railway station, New South Wales|Hill Top]]}}
{{BS|exHST||[[Colo Vale railway station, New South Wales|Colo Vale]]}}
{{BS|exHST||[[Braemar, New South Wales|Braemar]]}}
{{BS|eABZ3lf||Mittagong Junction}}
|}
|}


The '''Picton - Mittagong Loop Line''' is a partly disused railway line between the towns of [[Picton, New South Wales|Picton]] and [[Mittagong, New South Wales|Mittagong]] in the [[Southern Highlands (New South Wales)|Southern Highlands]] of [[New South Wales]], [[Australia]].
The '''Picton–Mittagong Loop Line''' is a partly disused railway line between the towns of [[Picton, New South Wales|Picton]] and [[Mittagong, New South Wales|Mittagong]] in the [[Southern Highlands (New South Wales)|Southern Highlands]] of [[New South Wales]], [[Australia]].


==History==
==History==
The Picton - Mittagong line was opened in February 1867 as part of the [[Main Southern railway line, New South Wales|Main South line]].<ref name=WABayley>{{cite book|last=Bayley|first=William A|title=Picton-Mittagong Loop Line Railway|year=197x|publisher=Austrail Publications|location=Bulli|isbn=0-909597-14-6}}</ref><ref>Singleton, C.C. ''Centenary of the opening of the Southern Line to Mittagong'', ''Bulletin'' (Australian Railway Historical Society) March 1967 pp. 49-68</ref>
The Picton–Mittagong line was opened in February 1867 as part of the [[Main Southern railway line, New South Wales|Main South line]].<ref name=WABayley>{{cite book|last=Bayley|first=William A|title=Picton-Mittagong Loop Line Railway|year=197x|publisher=Austrail Publications|location=Bulli|isbn=0-909597-14-6}}</ref><ref>Singleton, C.C. ''Centenary of the opening of the Southern Line to Mittagong'', ''Bulletin'' (Australian Railway Historical Society) March 1967 pp. 49–68</ref>


The line runs north from [[Picton railway station, New South Wales|Picton]], over the Picton Viaduct, across the Great South Road before heading west. It then heads south through a 180 metre tunnel in the Redbank Range.
The line ran north-northwest from [[Picton railway station, New South Wales|Picton]], over the Picton Viaduct, across the Great South Road before heading northwest. It then headed west-northwest through a {{Convert|180|m|adj=on}} tunnel in the Redbank Range.


Stations were constructed at [[Thirlmere railway station, New South Wales|Thirlmere]] (1885), [[Couridjah railway station, New South Wales|Couridjah]] (1867), [[Buxton railway station, New South Wales|Buxton]] (1893),
Stations were constructed at [[Thirlmere railway station, New South Wales|Redbank]] (1885), [[Couridjah railway station, New South Wales|Couridjah]] (1867), [[Buxton railway station, New South Wales|Buxton]] (1893),
[[Balmoral railway station, New South Wales|Balmoral]] (1878), [[Hill Top railway station, New South Wales|Hill Top]] (1878), [[Colo Vale railway station, New South Wales|Colo Vale]] (1883) and [[Braemar, New South Wales|Braemar]] (1867). There were a number of smaller stops, sidings and passing loops along the line, as well. North of Hill Top, the cutting through Big Hill was for many years the deepest in Australia.
[[Balmoral railway station, New South Wales|Balmoral]] (1878), [[Hill Top railway station, New South Wales|Hill Top]] (1878), [[Colo Vale railway station, New South Wales|Colo Vale]] (1883) and [[Braemar, New South Wales|Braemar]] (1867). There were a number of smaller stops, sidings and passing loops along the line, as well. North of Hill Top, the cutting through Big Hill was for many years the deepest in Australia. The rock-cut inscription dated 1863, commemorating the deaths of two men in an explosion during the excavation of the cutting, north of Hill Top, is considered one of the oldest in Australia.


To service the line, Picton became a busy station with a locomotive depot for [[bank engine]]s, dormitories for train crews, and goods sidings.<ref>Bayley, William A 1975. ''Picton-Mittagong Main Line Railway.'' Bulli: Austrail. ISBN 0-909597-15-4</ref><ref>Wright, Harry. "Picton Locomotive Depot and the Picton-Mittagong Loop Line", ''Roundhouse'' Vol. 41, No. 2, April 2004. pp. 5-15</ref>
To service the line, Picton became a busy station with a locomotive depot for [[bank engine]]s, dormitories for train crews, and goods sidings.<ref>Bayley, William A 1975. ''Picton-Mittagong Main Line Railway''. Bulli: Austrail. {{ISBN|0-909597-15-4}}</ref><ref>Wright, Harry. "Picton Locomotive Depot and the Picton-Mittagong Loop Line", ''Roundhouse'' Vol. 41, No. 2, April 2004. pp. 5–15</ref>


The line, while gently curved, had gradients as steep as 1 in 30. It was also a single-track line, and even though deviations were constructed between Hill Top and Colo Vale to ease grades, these factors combined to create a bottleneck, as rail traffic increased. In July 1919 a new double track alignment with ruling 1 in 75 grades between Picton and Mittagong via [[Bargo, New South Wales|Bargo]] opened. The original proposal was for the line to be shifted considerably further eastwards from [[Appin, New South Wales|Appin]] to [[Bargo, New South Wales|Bargo]] avoiding Picton. This was strongly opposed in Parliament by Picton local interests, hence the 180° curve that cicumnavigates the town.<ref name=WABayley/> The old line, now renamed the Loop Line, continued to be served by passenger services until August 1978. Most services were operated by [[New South Wales 30 class locomotive|30 class]] locomotives and later [[CPH railmotor]]s, although there was a Sunday evening service to Sydney hauled by main line locomotives as recently as 1973.
The line, while gently curved, had gradients as steep as 1 in 30. It was also a single-track line, and even though deviations were constructed between Hill Top and Colo Vale to ease grades, these factors combined to create a bottleneck, as rail traffic increased. In July 1919 a new double track alignment with ruling 1 in 75 grades between Picton and Mittagong via [[Bargo, New South Wales|Bargo]] opened. The original proposal was for the line to be shifted considerably further eastwards from [[Appin, New South Wales|Appin]] to [[Bargo, New South Wales|Bargo]] avoiding Picton. This was strongly opposed in Parliament by Picton local interests, hence the 180° curve that circumnavigates the town.<ref name=WABayley/> The old line, now renamed the Loop Line, continued to be served by passenger services until August 1978. Most services were operated by [[New South Wales 30 class locomotive|30 class]] locomotives and later [[CPH railmotor]]s, although there was a Sunday evening service to Sydney hauled by main line locomotives as recently as 1973.


From the 1960s the line was popular with steam hauled specials, and was the preferred route for most journeys where they could operate without inhibiting regular services.
From the 1960s the line was popular with steam hauled specials, and was the preferred route for most journeys where they could operate without inhibiting regular services.


Following it relocating to Thirlmere, in June 1976 the [[New South Wales Rail Transport Museum]] commenced operating steam services on the line between Picton and Buxton.<ref name=RoundhouseJul76>"Museum on the Move" ''Roundhouse'' July 1976 page 5</ref><ref name=RoundhouseJan94>"The New South Wales Rail Transport Museum The First Thirty Years" ''Roundhouse'' January 1994 page 4</ref>
Following it relocating to [[Thirlmere railway station, New South Wales|Thirlmere]], in June 1976 the [[New South Wales Rail Transport Museum]] (NSW Rail Museum) commenced operating steam services on the line between Picton and Buxton.<ref name=RoundhouseJul76>"Museum on the Move" ''Roundhouse'' July 1976 page 5</ref><ref name=RoundhouseJan94>"The New South Wales Rail Transport Museum The First Thirty Years" ''Roundhouse'' January 1994 page 4</ref>


The line remained open throughout, although by the 1980s the Buxton to Braemar section saw little use. [[CPH railmotor]] CPH22 ran a trip to Braemar and three shuttles between Braemar and Hilltop on 31 May 1987,<ref>"CPH 22 Back in Service" ''Railway Digest'' August 1987 page 260</ref> before a trestle bridge between Colo Vale and Braemar suffered flood damage, resulting in the line being divided into two separate branches in September 1987.<ref>"Picton-Mittagong Loop Line" ''Railway Digest'' November 1987 page 366</ref>
The line remained open throughout, although by the 1980s the Buxton to Braemar section saw little use. [[CPH railmotor]] CPH22 ran a trip to Braemar and three shuttles between Braemar and Hilltop on 31 May 1987,<ref>"CPH 22 Back in Service" ''Railway Digest'' August 1987 page 260</ref> before a trestle bridge between Colo Vale and Braemar suffered flood damage, resulting in the line being divided into two separate branches in September 1987.<ref>"Picton-Mittagong Loop Line" ''Railway Digest'' November 1987 page 366</ref>


Following the Department for Transport calling for expressions of interest for using a number of disused lines, the Rail Transport Museum was granted a lease over the Picton to Buxton section in 1993.<ref>"Rail Transport Museum Set to Lease Loop Line" ''Railway Digest'' August 1993 page 316</ref>
Following the Department for Transport calling for expressions of interest for using a number of disused lines, the [[Trainworks Railway Museum|New South Wales Rail Transport Museum]] was granted a lease over the Picton to Buxton section in 1993.<ref>"Rail Transport Museum Set to Lease Loop Line" ''Railway Digest'' August 1993 page 316</ref>


The Mittagong Junction to Braemar section remains open to access the [[Bradken]] rolling stock and Rocla concrete sleeper facilities.
The Mittagong Junction to Braemar section remains open to give access to the [[Bradken]] rolling stock and Rocla concrete sleeper facilities.


On 1 March 2019, the NSW Government promised to fund the re-opening of the Picton Loop Line between Buxton and Colo Vale. The grant will also fund the construction of new platforms at Picton, Hill Top and Balmoral.<ref>{{Cite web|url=https://dsf.newscorpaustralia.com/dailytelegraph/subscription/|title=Dailytelegraph.com.au &#124; Subscribe to The Daily Telegraph|website=Dsf.newscorpaustralia.com|access-date=25 November 2021}}</ref><ref>{{Cite web |last=Nealon |first=Kelly |date=20 September 2020 |title=Wollondilly rail upgrade gathers steam |url=https://insidelocalgovernment.com.au/wollondilly-rail-upgrade-gathers-steam/ |access-date=3 June 2023 |website=Inside Local Government |language=en-AU}}</ref><ref>{{Cite web |title=Loop Line Upgrade Project |url=https://www.thnsw.com.au/loop-line |access-date=3 June 2023 |website=THNSW |language=en}}</ref>
===Coach Route===

[[NSW TrainLink]] operates buses in lieu of the former rail service. Six services are provided under contract by [[Buslines Group|Berrima Buslines]] in each direction on weekdays only with stops at:
===Coach route===
[[NSW TrainLink]] operates buses in lieu of the former rail service. Six services are provided under contract by [[Buslines Group|Berrima Buslines]] from Bowral and seven from Picton on weekdays only with stops at:<ref>{{Cite New South Wales transport timetables|R828}}</ref>


*[[Picton railway station, New South Wales|Picton station]]
*[[Picton railway station, New South Wales|Picton station]]
Line 70: Line 66:
*Wilson Drive, [[Balmoral (Southern Highlands), New South Wales|Balmoral]]
*Wilson Drive, [[Balmoral (Southern Highlands), New South Wales|Balmoral]]
*Wilson Drive, [[Hill Top, New South Wales|Hill Top]]
*Wilson Drive, [[Hill Top, New South Wales|Hill Top]]
*Wilson Drive & Church Street, [[Colo Vale, New South Wales|Colo Vale]]
*Wilson Drive & Church Avenue, [[Colo Vale, New South Wales|Colo Vale]]
*[[Mittagong railway station, New South Wales|Mittagong station]]
*[[Mittagong railway station, New South Wales|Mittagong station]]
*[[Bowral railway station, New South Wales|Bowral station]]
*[[Bowral railway station, New South Wales|Bowral station]]

==References==
{{Reflist|2}}


==Gallery==
==Gallery==
<gallery caption="Existing features and infrastructure" widths="200px" heights="100px" perrow="4">
<gallery caption="Existing features and infrastructure" widths="200px" heights="100px" perrow="4" class="center">
File:Picton Loop Line Turnout.jpg|<center>Fig 1: Approach to Picton station with<br>loop line on the left</center>
File:Picton Loop Line Turnout.jpg| Approach to Picton station with loop line on the left
File:Picton Viaduct 2010.jpg|<center>Fig 2: Viaduct over Stonequarry<br>Creek, Picton</center>
File:Picton Viaduct 2010.jpg| Viaduct over Stonequarry Creek, Picton
File:Picton NSW Tollgate Lodge.jpg|<center>Fig 3: Gatekeeper's Cottage,<br>Picton</center>
File:Picton NSW Tollgate Lodge.jpg| Gatekeeper's cottage, Picton
File:Picton Mushroom Tunnel.jpg|<center>Fig 4: Tunnel through Redbank Range</center>
File:Picton Mushroom Tunnel.jpg| Tunnel through Redbank Range
File:Picton Loop and Main Lines.jpg|<center>Fig 5: Looking north with Loop Line<br>on left 1919 deviation<br>on right</center>
File:Picton Loop and Main Lines.jpg| Looking north with Loop Line on left 1919 deviation on right
File:Picton Mittagong Loop Line.jpg|<center>Fig 6: Redbank, between Picton and Thirlmere</center>
File:Picton Mittagong Loop Line.jpg| Redbank, between Picton and Thirlmere
File:Thirlmere Culvert Near Redb.jpg|<center>Fig 7: Culvert near Redbank</center>
File:Thirlmere Culvert Near Redb.jpg| Culvert near Redbank
File:Thirlmere NSW Railway Station.jpg|<center>Fig 8: Thirlmere station</center>
File:Thirlmere NSW Railway Station.jpg| Thirlmere station
File:Couridjah_station_NSW.jpg|<center>Fig 9: Couridjah station</center>
File:Couridjah_station_NSW.jpg| Couridjah station
File:Pumphouse Thirlmere Lakes NSW.jpg|<center>Fig 10: Former pumphouse<br>near Couridjah station</center>
File:Pumphouse Thirlmere Lakes NSW.jpg| Former pumphouse near Couridjah station
File:Standpipes Couridjah Station.jpg|<center>Fig 11: Standpipes<br>near Couridjah station</center>
File:Standpipes Couridjah Station.jpg| Standpipes near Couridjah station
File:Buxton Railway Station.jpg|<center>Fig 12: Buxton station</center>
File:Buxton Railway Station.jpg| Buxton station
File:Buxton Station Locomotive.jpg|<center>Fig 13: NSWRTM's 2705<br>at Buxton station</center>
File:Buxton Station Locomotive.jpg| NSWRTM's 2705 at Buxton station
File:Balmoral Abandoned Railway.jpg|<center>Fig 14: Balmoral station</center>
File:Balmoral Abandoned Railway.jpg| Balmoral station
File:Loop Line Big Hill Cutting.jpg|<center>Fig 15: Big Hill Cutting<br>north of Hill Top</center>
File:Loop Line Big Hill Cutting.jpg| Big Hill cutting north of Hill Top
File:Hill Top Big Hill Monument.jpg|<center>Fig 16: Monument to Human Endeavour<br>near Big Hill Cutting</center>
File:Hill Top Big Hill Monument.jpg| Monument to Human Endeavour near Big Hill cutting
File:Survey Peg Loop Line.jpg|<center>Fig 17: Survey peg, in Big Hill cutting</center>
File:Survey Peg Loop Line.jpg| Survey peg, in Big Hill cutting
File:Loop Line Explosion Memorial.jpg|<center>Fig 18: Inscription commemorating<br>deaths of workers from explosion, 1863</center>
File:Loop Line Explosion Memorial.jpg| Inscription commemorating deaths of workers from explosion, 1863
File: Hill Top Station Platform.jpg|<center>Fig 19: Hill Top station</center>
File: Hill Top Station Platform.jpg| Hill Top station
File:Loop Line Colo Vale Turnout.jpg|<center>Fig 20: Passing loop points, Colo Vale station</center>
File:Loop Line Colo Vale Turnout.jpg| Passing loop points, Colo Vale station
File:Colo Vale Railway Station.jpg|<center>Fig 21: Colo Vale station</center>
File:Colo Vale Railway Station.jpg| Colo Vale station
File:Colo Vale Bridge Over Loop Line.jpg|<center>Fig 22: Colo Vale Road Underbridge</center>
File:Colo Vale Bridge Over Loop Line.jpg| Colo Vale Road underbridge
File:Braemar Yards Loop Line.jpg|<center>Fig 23: Braemar Industrial Area yards</center>
File:Braemar Yards Loop Line.jpg| Braemar industrial area sidings
File:Loop Line Mittagong.jpg|<center>Fig 24: North of Mittagong looking south<br>with 1919 deviation on left,<br>Loop Line on right</center>
File:Loop Line Mittagong.jpg| North of Mittagong looking south with 1919 deviation on left, Loop Line on right
</gallery>
</gallery>

==References==
{{reflist}}

==External links==
* [https://www.abc.net.au/news/2017-08-22/picton-to-mittagong-return-of-the-age-of-steam/8781430 Return of steam trains on reclaimed rail trail] 2021 ABC News article about proposed combined rail trail and steam train operations.


{{Railway lines in New South Wales}}
{{Railway lines in New South Wales}}


{{DEFAULTSORT:Picton - Mittagong Loop Railway Line, New South Wales}}
{{DEFAULTSORT:Picton-Mittagong Loop Railway Line, New South Wales}}
[[Category:Regional railway lines in New South Wales]]
[[Category:Regional railway lines in New South Wales]]
[[Category:Standard gauge railways in Australia]]
[[Category:Standard gauge railways in Australia]]
[[Category:Railway lines opened in 1867]]
[[Category:Railway lines opened in 1867]]
[[Category:Mittagong, New South Wales]]

Latest revision as of 11:21, 5 July 2023

Picton–Mittagong Loop Line
Overview
StatusHeritage operation; partially disused
LocaleSouthern Highlands
Stations9
Service
Operator(s)Transport Heritage NSW
History
OpenedFebruary 1867
Route map
Map
Picton Loop Line
Picton Junction
Old Main Tunnel
Thirlmere
Couridjah
Buxton
Balmoral
Hill Top
Colo Vale
Braemar
Mittagong Junction

The Picton–Mittagong Loop Line is a partly disused railway line between the towns of Picton and Mittagong in the Southern Highlands of New South Wales, Australia.

History[edit]

The Picton–Mittagong line was opened in February 1867 as part of the Main South line.[1][2]

The line ran north-northwest from Picton, over the Picton Viaduct, across the Great South Road before heading northwest. It then headed west-northwest through a 180-metre (590 ft) tunnel in the Redbank Range.

Stations were constructed at Redbank (1885), Couridjah (1867), Buxton (1893), Balmoral (1878), Hill Top (1878), Colo Vale (1883) and Braemar (1867). There were a number of smaller stops, sidings and passing loops along the line, as well. North of Hill Top, the cutting through Big Hill was for many years the deepest in Australia. The rock-cut inscription dated 1863, commemorating the deaths of two men in an explosion during the excavation of the cutting, north of Hill Top, is considered one of the oldest in Australia.

To service the line, Picton became a busy station with a locomotive depot for bank engines, dormitories for train crews, and goods sidings.[3][4]

The line, while gently curved, had gradients as steep as 1 in 30. It was also a single-track line, and even though deviations were constructed between Hill Top and Colo Vale to ease grades, these factors combined to create a bottleneck, as rail traffic increased. In July 1919 a new double track alignment with ruling 1 in 75 grades between Picton and Mittagong via Bargo opened. The original proposal was for the line to be shifted considerably further eastwards from Appin to Bargo avoiding Picton. This was strongly opposed in Parliament by Picton local interests, hence the 180° curve that circumnavigates the town.[1] The old line, now renamed the Loop Line, continued to be served by passenger services until August 1978. Most services were operated by 30 class locomotives and later CPH railmotors, although there was a Sunday evening service to Sydney hauled by main line locomotives as recently as 1973.

From the 1960s the line was popular with steam hauled specials, and was the preferred route for most journeys where they could operate without inhibiting regular services.

Following it relocating to Thirlmere, in June 1976 the New South Wales Rail Transport Museum (NSW Rail Museum) commenced operating steam services on the line between Picton and Buxton.[5][6]

The line remained open throughout, although by the 1980s the Buxton to Braemar section saw little use. CPH railmotor CPH22 ran a trip to Braemar and three shuttles between Braemar and Hilltop on 31 May 1987,[7] before a trestle bridge between Colo Vale and Braemar suffered flood damage, resulting in the line being divided into two separate branches in September 1987.[8]

Following the Department for Transport calling for expressions of interest for using a number of disused lines, the New South Wales Rail Transport Museum was granted a lease over the Picton to Buxton section in 1993.[9]

The Mittagong Junction to Braemar section remains open to give access to the Bradken rolling stock and Rocla concrete sleeper facilities.

On 1 March 2019, the NSW Government promised to fund the re-opening of the Picton Loop Line between Buxton and Colo Vale. The grant will also fund the construction of new platforms at Picton, Hill Top and Balmoral.[10][11][12]

Coach route[edit]

NSW TrainLink operates buses in lieu of the former rail service. Six services are provided under contract by Berrima Buslines from Bowral and seven from Picton on weekdays only with stops at:[13]

Gallery[edit]

References[edit]

  1. ^ a b Bayley, William A (197x). Picton-Mittagong Loop Line Railway. Bulli: Austrail Publications. ISBN 0-909597-14-6.
  2. ^ Singleton, C.C. Centenary of the opening of the Southern Line to Mittagong, Bulletin (Australian Railway Historical Society) March 1967 pp. 49–68
  3. ^ Bayley, William A 1975. Picton-Mittagong Main Line Railway. Bulli: Austrail. ISBN 0-909597-15-4
  4. ^ Wright, Harry. "Picton Locomotive Depot and the Picton-Mittagong Loop Line", Roundhouse Vol. 41, No. 2, April 2004. pp. 5–15
  5. ^ "Museum on the Move" Roundhouse July 1976 page 5
  6. ^ "The New South Wales Rail Transport Museum The First Thirty Years" Roundhouse January 1994 page 4
  7. ^ "CPH 22 Back in Service" Railway Digest August 1987 page 260
  8. ^ "Picton-Mittagong Loop Line" Railway Digest November 1987 page 366
  9. ^ "Rail Transport Museum Set to Lease Loop Line" Railway Digest August 1993 page 316
  10. ^ "Dailytelegraph.com.au | Subscribe to The Daily Telegraph". Dsf.newscorpaustralia.com. Retrieved 25 November 2021.
  11. ^ Nealon, Kelly (20 September 2020). "Wollondilly rail upgrade gathers steam". Inside Local Government. Retrieved 3 June 2023.
  12. ^ "Loop Line Upgrade Project". THNSW. Retrieved 3 June 2023.
  13. ^ "Loop service timetable". Transport for NSW.

External links[edit]