www.fgks.org   »   [go: up one dir, main page]

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

COBRAcable is down

4C Offshore | Rameeza Haq Duggal
By: Rameeza Haq Duggal 02/10/2020 4C Offshore
The 700 MW COBRAcable is down today (25 September 2020). The reason of the failure is still unknown and investigations are underway. A capacity curtailment due to force majeure was reported earlier today.

Previously, the COBRAcable experienced a power outage on 11 and 12 August 2020.  This was due to a problem with a converter station. The issue was resolved within 48 hours.


COBRAcable is a significant interconnector between the Netherlands and Denmark. The 325km HVDC cable was established in collaboration with the Dutch TSO TenneT and the Danish TSO Energinet. The cable was fully commissioned in Q3 2019.


Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo